GB Civil Solutions completed building pad, driveway and yard preparation across several lots in a Grafton hinterland subdivision. The work was sequenced with the builder’s slab program and included crusher dust placement around outdoor areas.
Scope of Work
- Machinery mobilised across multiple lots
- Building pads prepared for the slab program
- Crusher dust placed around outdoor areas
- Driveway subgrades and base material prepared
- Work sequenced with the builder's trades