GB Civil Solutions prepared the shed slab subgrade and built a concrete sleeper retaining wall for a Gulmarrad property. The earthworks and retaining scope was coordinated around the shed construction requirements.
Scope of Work
- Subgrade prepared for the shed slab
- Retaining wall set out along the side and rear boundaries
- Retaining wall constructed to the agreed layout
- Earthworks coordinated around the slab preparation