Family-owned since the Sunshine Coast days Townsend · Maclean · Yamba · Grafton · Iluka 30+ years on the tools
Location Maclean, NSW 2463
Completed March 2022

Maintenance work on the River Street flood levy in Maclean - one of the visible pieces of civil infrastructure that keeps the town centre dry when the Clarence runs hard. The brief was to top up and spread road base along a section of the levy line and clean down the road and gutters where the works met the carriageway.

A few days on the bobcat, tipper running on the side, finished before the next forecast wet.

Scope of work

  • Bobcat hire on the River Street levy alignment
  • Supply and spread of road base along the levy edge
  • Clean-down of the adjacent road surface and gutters
  • Tipper cartage of arisings off-site