A retail business in Townsend needed its customer driveway and parking area rebuilt without closing the site for longer than a working week. We boxed out 200mm of existing pavement, brought in sub-base from the James Creek yard, compacted in lifts and finished with a clean trim ready for the sealing crew.
The whole job was sequenced so foot traffic and signage stayed accessible through the rebuild.
Scope of work
- Box-out of existing driveway and parking pavement to 200mm depth
- Sub-base material supply and placement
- Track-rolled compaction in lifts to engineer specification
- Final trim and crossover detail back to council kerb