GB Civil Solutions reconstructed the driveway at a community site in Yamba. The work covered removal of the existing pavement and concrete, subgrade preparation, bedding sand supply, and final shaping of the access area.
Scope of Work
- Existing driveway and concrete removed from site
- Subgrade prepared for the rebuilt access
- Bedding sand supplied and placed
- Excavator, skid steer and truck work completed through the driveway area